OEE & Downtime
Cost Calculator
Enter your line data to see your real OEE — and what downtime and lost OEE are costing you per year. Results appear instantly. No signup required.
Planned production time — when the line is scheduled to run. E.g., 2 shifts × 12h × 5 days = 120.
Weeks per year you run, after planned shutdowns and holidays.
Average unplanned stoppage time per week — breakdowns, unplanned changeovers, waiting. Don't include planned maintenance.
Your line's maximum rate at full speed — the design or nameplate rate. Units per hour.
Total units produced per week, including any that were scrapped or reworked.
Share of produced units that are defective (scrap + rework). Quality = 100% − this.
Profit per good unit (price − variable cost). Use margin, not full price, to avoid overstating.
The OEE you're aiming for. 85% is the recognised world-class benchmark.
Optional. If you track a blended cost per hour of downtime, enter it to override the calculated estimate.
Enter your line data to see results
Data Readiness Scorecard
OEE shows the symptom. The cause is usually your data foundation — see where yours stands.
Take the Scorecard ServiceAnalytics & Intelligence
Real-time OEE from connected data — catch problems on the shift they happen, not in yesterday's report.
See how it works ServiceArtificial Intelligence
Predictive maintenance cuts unplanned downtime 30–50%. It works when your data foundation is solid.
See how it works Talk to usBook a Discovery Call
See what closing your OEE gap could look like for your operation. No pitch decks.
Book a Discovery CallFREE REPORT
Email me the full breakdown + industry benchmark
Get a PDF of your results plus benchmark data for your industry. Results are already visible above — this unlocks the detailed version.
Your scorecard is a snapshot.
Discovery is the full picture
Let's connect your data foundation — and turn it into decisions your floor can act on.
Or email hello@iontek.io